Six Chip Giants Stretch Lead Times Even as Earnings Rebound

The third-quarter calls of six analogue and power chip makers, reported on 15 November, put two opposite trends side by side. Microchip's standard-product lead times stretched from 4-8 weeks to 6-32 weeks; NXP said about 80 per cent of orders now exceed 16 weeks, against roughly 25 per cent a year earlier. Yet the same companies posted strong sales: Texas Instruments revenue of USD 6.06 billion, up 28 per cent, with data-centre business up about 95 per cent; Microchip USD 1.622 billion, up 42.2 per cent; Infineon guided fiscal 2027 revenue to about EUR 20 billion.
The explanation is a split between the financial ledger and the capacity ledger. New investment is concentrated in 2-3 nm advanced nodes and memory, not in the 28-130 nm mature processes that power management, voltage regulation and MCU chips are built on. TI's Korea lead said as much on 11 November: building more advanced fabs does not increase mature-node supply. AI racks also need power conversion, thermal control and MCUs, all sharing the same mature wafers and back-end packaging lines as industrial and automotive parts. Microchip makes its own wafers but sends them out for assembly and test, where large AI customers take priority.

For buyers of automotive MCUs, industrial controllers, appliance power boards and robot joint drives, two things are being compressed at once: lead time and quote validity. Freeze the BOM early, qualify a second-source MCU and sensor before the gap appears, and share rolling forecasts with the distributor so you are visible in the allocation queue. Trend data from distributors puts most MCU classes at 26 weeks or more, with selected ST families at 52 weeks, so a annual quote built on last year's lead time is already stale. Our /parts/ catalogue carries the parameter fields needed to compare alternatives; qualification still sits with engineering.
One caution keeps this from being a repeat of 2021. Both Microchip and NXP say they have not seen broad restocking, so a longer quote is not the same as a market-wide shortage, and panic orders would manufacture the squeeze they fear. At the same time, the demand is structural: TI estimates USD 500-1,000 of chips in a humanoid robot, and NXP says software-defined architectures can lift per-vehicle content to two or three times the traditional design. Keep RoHS, REACH and AEC-Q files current, and treat 2027 quotations as carrying a price-adjustment clause unless the supplier commits otherwise in writing.

YouHuiYou Components