A BOM does not fail all at once. It fails on three or four lines — the one part with a 30-week lead time, the one that went obsolete, the one nobody can confirm the exact suffix of. Buying the other 80 lines is easy; those three are why projects slip.
Send the file as you have it — CSV, XLSX, a PDF from your ERP, even a pasted list. We read it line by line and return a quote that marks, for every line: availability, unit price at your quantity, MOQ, and lead time. Long-lead and single-source lines are flagged rather than buried, so you can see the critical path in the first screen instead of the third week.
Where a line is constrained we propose a documented second source — same footprint, same electrical behaviour, or a grade that meets your temperature range — and let you approve it. We do not substitute silently. Where a line is obsolete we say what replaced it and whether the replacement is drop-in or needs a layout change.
Once the quote is approved the order is kitted in Shenzhen: one shipment, one packing list, date codes matched across reels where the build needs it. Stock lines dispatch within two working days; sourced-to-order lines carry a confirmed date, not a range.


















Only a sample of the lines we handle is listed here — 10,000+ part numbers are available through our franchised and independent channels. Send your BOM for volume pricing.
Tick the part numbers above — or paste your BOM below — add your e-mail, and we reply with line-by-line pricing, MOQ and lead time within 4 working hours. Attaching a BOM file is fastest.